|
Studio
342 uses bids from past construction
projects to project the construction cost
for current and future projects as
accurately as possible. The cost
projection is used to check that a design is
within a client's budget range, or to help
establish construction phases that fall
within that budget. A ballpark cost
projections can be prepared with the
completion of the Master Plan. A more
detailed and specific cost projection can be
prepared after construction documents are
finished and all materials and finishes are
known.
|